Ex-WAPDA Bill Estimator A-1 Domestic

NEPRA Uniform Tariff Schedule & Tax Engine (2024-2025)

Applicable DISCOs: LESCO, IESCO, MEPCO, FESCO, PESCO, GEPCO, HESCO, SEPCO, QESCO, TESCO, KE (K-Electric)
Last NEPRA Schedule Sync: Current Uniform Tariff
1

Select Domestic Consumer Category

Categories determine variable rates and telescopic slab structure as defined by NEPRA.
2

Meter Parameters & Units Consumed

Enter monthly units from meter reading
3

Government Taxes & Adjustments

Official NEPRA Standard
FC Surcharge
Financing Cost Surcharge levied by govt across Pakistan.
Rs 3.23 / unit
Included in Subtotal
General Sales Tax (GST) 18%
Applied on Subtotal
PTV Fee Rs 35.00
Flat monthly fee
Electricity Duty (ED) 1.5%
Provincial duty on base cost
Estimated Total Bill
Rs 0.00
Non-Protected
Total Units: 0 kWh
Base Energy: Rs 0.00
Fixed Charges: Rs 0.00
FC Surcharge: Rs 0.00
GST (18%): Rs 0.00
Effective Rate: Rs 0.00

Visual Cost Breakdown

NEPRA Active Tariff Reference

Slab / Category Var. Rate Fixed / kW
Non-Protected 1-100 Rs 22.44 Rs 275
FC Surcharge: Rs 3.23/kWh | GST: 18%

Understanding Pakistan's Electricity Tariff Structure (Domestic A-1)

Everything you need to know about Protected status, Telescopic billing, Fixed Charges, and Government Surcharges.

Protected vs. Non-Protected Consumers

Protected Status: Granted to domestic consumers whose monthly consumption has not exceeded 200 units in any of the last six consecutive months. Protected consumers receive subsidized rates and telescopic slab benefits.

Non-Protected Status: Triggered as soon as consumption exceeds 200 units in any single month of the previous 6 months. Non-protected rates follow landing-slab pricing, meaning all units are charged at the rate of the final slab reached.

Telescopic vs. Landing-Slab Billing

Telescopic Billing: You get the benefit of lower pricing for initial slabs. For example, the first 100 units are charged at Slab 1 rates, and only units from 101 to 200 are charged at Slab 2 rates.

Landing-Slab Billing (Non-Telescopic): If you consume 250 units, ALL 250 units are multiplied directly by the 201-300 slab rate (Rs 33.10/unit), rather than dividing into 100+100+50.

Fixed Charges & FC Surcharge Explained

Fixed Charges: Calculated per kW of Sanctioned Load per month (e.g., Rs 275/kW for Non-Protected 1-100 units). For 2 kW load, fixed charges are 2 × 275 = Rs 550.

Financing Cost (FC) Surcharge: A uniform surcharge of Rs 3.23 per unit (kWh) added to taxable energy cost across Pakistan to service power sector debt.

Time of Use (TOU) Metering (≥ 5 kW Load)

Mandatory for 3-phase connections with sanctioned load of 5 kW or higher.

  • Peak Hours Rate: Rs 46.85 / kWh (usually 4 hours in evening, e.g. 5 PM to 9 PM or 6 PM to 10 PM depending on season).
  • Off-Peak Hours Rate: Rs 34.53 / kWh (remaining 20 hours).
  • Fixed Charge: Rs 675 / kW / month on 50% of sanctioned load or actual MDI.